The JETP model does not impose any minimum dispatch for coal power plants to reflect contractual offtake obligations.

However, the results are technically sense-checked against PLN and MEMR guidance on national minimums, which are CFPP's capacity factors (CF) of 65% from 2024, 63% from 2030, and 50% from 2040 onward​, compared to the Business as Usual scenario where CFPP's CF is around 80%.

For more information on the CFPP dispatch information can be found in Sub Chapter 5.2.1.2 of the CIPP.